Having trouble reading this email? View it on your browser.

Home Source Builders

"Take rest. A field that has rested gives bountiful crop." ~ Ovid

Hoping everyone had an enjoyable and restful Labor Day!

Other September holidays we don't want you to miss!

  • 9/9 - National Teddy Bear Day
  • 9/16 - National Play-Doh Day
  • 9/19 - International Talk Like a Pirate Day
  • 9/22 - Autumn Equinox. Pumpkin Spice season officially begins at 3:21 pm here in Asheville, NC

Mark ye calendars, me hearties or ye'll walk the plank. Savvy?! 

___________

Summer may be coming to a close, but there's still time to plant some of your favorite vegetables.  To get the full benefit from your Victory Garden and stay close to nature, consider planting these vegetables in late summer to yield crops for fall harvesting. 

  • Beets
  • Carrots
  • Kale
  • Lettuce
  • Peas
  • Spinach

To name a few. For more information, visit The Old Farmer's Almanac.

Garlic Sauteed Spinach

  • 1 /12 Fresh Spinach 
  • 2 tbsp Olive Oil
  • 2 tbsp Garlic 
  • 3/4 tsp black pepper
  • 1 tbsp butter
  • Lemon

Click here for full recipe from Foodnetwork.com

 

Building Success 101

Q: How long have you been working in this town?

A: The local track record is an important thing to ask about when choosing a contractor. A company that's firmly established in a particular market will have an interest in protecting its reputation and will have built a network of reliable subcontractors that help it maintain that reputation.

Gallery

Facebook Like Button Tweet Button
Tell a Friend

Managing the Great Supply Crunch

In the future, you can tell friends and family what things were like during the Great Supply Crunch

If you're contemplating a new custom home, you're no doubt aware of rising costs for lumber and other building materials. That problem has gotten plenty of media coverage. But price isn't the only challenge. There's another issue that, while it gets more attention from the business media than from the popular press, is giving headaches to builders and homeowners alike.

We're talking about the supply chain. Over the past year we've seen shortages of just about everything that goes into a home, and those shortages have rolled unpredictably from product to product. No one knows when a particular item will suddenly be back-ordered or for how long. And because building product suppliers, like those in nearly all industries, have adopted a just-in-time delivery model, they lack warehouse space to keep items in stock.

If you have built before, that means this time will be different. Your builder will get the job done, but it may take longer than either of you want, and the schedule could change at any time.

This environment of uncertainty makes it more important than ever to choose the right builder. You need an experienced pro with great management systems—systems that can mitigate the effects of shortages as much as possible.

The best builders create detailed schedules, while also remaining nimble.

The construction industry uses what's called Critical Path Scheduling, which defines the sequence in which tasks must happen. For instance, you can't shingle a roof before installing the sheathing.

The critical path also defines when products must be selected and ordered, and this is where homeowners are feeling the biggest impact. Basically, everything has to be ordered earlier. To visualize this, imagine a line drawn from left to right, with deadlines for selecting each item marked at intervals on the line. The entire line has shifted to the left.

Windows that took 4 weeks to get in the past now require 16 weeks. Cabinet decisions that could wait until after drywall installation may now need to be made as soon as the kitchen has been rough-framed. In some cases, the back order may be such that keeping the job on schedule requires the homeowners to choose a different item. We've seen this with some ceramic tiles.

Even with great planning and timely selections, on-time delivery isn't 100 percent guaranteed these days. Shortages and back orders can strike unexpectedly, and that's where nimble scheduling earns its keep.

Whether the schedule can adapt to a specific delay depends on the product. If the aforementioned roof sheathing doesn't show up on time, the job can't move forward. That delay is a stop sign on the critical path.

On the other hand, the builder can schedule detours around some delays. Plumbers and electricians usually don't start running pipes and wires until after the siding is complete. But what if the siding gets held up because there's an unexpected 2-week delay in window deliveries? Siding can't begin until the windows are in place. Neither can insulation or drywall, as they both require a guaranteed dry interior. The answer is that the plumbers and electricians can start early.

Of course, you may be aware that there's also a supply crunch when it comes to skilled trades. There simply aren't enough electricians, plumbers, HVAC technicians, drywall finishers and others to meet current demand. That makes it tough for them to reschedule. However, these trades will be more flexible when working for an established professional with whom they have a longstanding business relationship.

That pro is the builder you want on your side under any circumstances, but even more so during this challenging time.

Warm Regards,

Tim Alexander
Home Source Builders
172 Charlotte Street
Asheville, NC 28801

(828) 252-1022 - phone

tim@homesourcebuilders.com
www.homesourcebuilders.com

Find Us on Facebook

Copyright 2021. All rights reserved.

Click here to unsubscribe

Associations

Footer
Houzz Facebook Email Home Source Builders Our Process About Us Gallery Design Center