September 2021

No images? Click here

GUY Engineering
 

Construction underway at Bridge #27 over Biddy Creek, Oklahoma County

 

Built in 1943, the original Bridge #27 was a 12'x6' RCB that was functionally obsolete. The replacement bridge is a precast concrete arch span bridge constructed on the existing alignment.

The project includes widening the roadway to match the width of the existing road east and west of the bridge. Ditches are also being added near the project to improve drainage.

 
 

Around the office in August

 
 

GUY Team Recruits at OSU Career Fair

 
 
 
GUY's services
 
  Share 
  Share 
  Forward 

www.GUYengr.com

TULSA METRO OFFICE

6910 E 14th St

Tulsa, OK 74112

 (918) 437-0282

OKC METRO OFFICE
1741 W 33rd St, Ste 110
Edmond, OK 73013
(405) 608-4217

Preferences  |  Unsubscribe