Integration of Siemens PLCs with alarm dialler realised

No images? Click here

Go to website  Adésys
 

Report control and automation malfunctions in detail to TD?

 

Siemens PLCs are widely used to control a variety of industrial processes. You know better than anyone that in the event of a malfunction in the process or process control, it is important that the technical department is notified in good time.

By connecting Siemens PLCs via the network to an Octalarm Touch-Pro with Octalarm Link licence, malfunction information about the nature and cause can be included directly from the PLC in the alarm message. This makes it easier to interpret the malfunction and determine its urgency more easily and accurately.

Ways of reporting

  • Spoken messages: the alarm information from the PLC is automatically spoken via speech synthesis.
  • Adésys Alarm App: push notifications directly to your smartphone or pager.
  • Notification via text message and/or Email.

New: Siemens PLCs can now be connected to Touch Pro with Link licence via network

After months of development and internal testing, the integration between the Siemens PLC (S7-1200 and S7-1500 series) and Touch Pro with Link licence has been realised. The PLC software module (JSON protocol) for Siemens PLCs was developed in TIA Portal V18, but can be converted to v17 and V16 if desired.

Technology is only valuable when it is safe, stable and user-friendly. That is why we like to test our innovations in practice—preferably together with (future) end customers and installers. And so we are looking for pilot projects for this new connection.

Do you have a pilot project for this new connection?

We believe it is important to test the integration between Siemens PLCs and Touch Pro (with Link licence) in practice. That is why we ask for a clear level of commitment for pilot projects:

Requirements for participation

  • Both an end customer and an installer are involved in the project.
  • A PLC programmer is available. (If desired, we can put you in touch with an external party who is familiar with this link.)
  • A test environment is preferred. If you are testing in a production environment, we strongly recommend running a redundant PLC.

Points to note during testing

  • Programming the connection between the Siemens PLC and the alarm device (manual available).
  • Installation and configuration of the alarm (manual available).
  • Testing of the alarm handling: Siemens PLC → alarm dialler.
  • Biweekly feedback session on:
    - progress of the pilot;
    - findings and areas for improvement.

Period

  • Minimum test duration: 1 month.
  • Desired test duration: 2 months.

Yes, I would like to test it!

I will register by Email
I'll call for more information
 
 

Want to know more?

Would you like to know more about the services of Adesys B.V., or do you need advice on your choice? Then please call or Email our sales department for advice without any obligation.

Link to LinkedIn page
Link to Facebook page
Link to Adésys YouTube channel

Follow us on social media

Stay informed quickly and easily about what is going on within alarms and all telecom network changes:

  1. click on the logo of the desired channel on the left;
  2. click on "follow".
 
 
WebsiteLinkedInFacebookYouTube
 
Link to Adésys website
  Share 
  Share 
Adesys B.V.
Molenweer 4
2291 NR Wateringen
The Netherlands
info@adesys.nl
+31 174 794022
K.v.k: Haaglanden 27221833

You are receiving this newsletter because your company is registered in our customer relationship management system as operating in the industrial sector. If you are no longer interested in the news from Adésys, please unsubscribe via the link below or better yet, adjust your preferences so that you only receive the information that is relevant to you.

Preferences  |  Unsubscribe