No images? Click here Akaroa Wharf replacement project updateThe structural repairs on Akaroa Wharf that got underway in October are now complete. The work included replacing structural members, pile support and protection, and decking repairs. Read on to learn about how the rest of the project is coming along.Design tender to go out A tender for a design team is set to go out in January. Once appointed, the designers will develop a detailed plan for the new wharf, which will be constructed on the same footprint as the existing structure, with an increase in deck height to allow for sea level rise. Building condition assessments Structural investigations are currently underway to confirm the condition of these buildings and their supporting structures. Information session Drummonds Wharf Drummond Wharf could work for operators if it was repaired within its existing footprint and then extended around 40 metres into the harbour with floating pontoons. This would allow the water to be deep enough for tourism operators to berth their boats. The floating pontoons could be attached to the wharf for people boarding vessels and these could then potentially be re-used for the rebuilt Akaroa Wharf. Looking ahead Stay updatedThis regular e-newsletter is aimed at keeping everyone up-to-date about the Akaroa Wharf rebuild. If you know of anyone who would like to receive this e-newsletter they can subscribe online or if you do not wish to receive these updates, you can unsubscribe at the bottom of the email. If you have any questions, or would like further information about the replacement wharf, please call us on 03 941 8999 or 0800 800 169 or visit ccc.govt.nz/akaroawharf Thanks in advance for your patience and co-operation as we carry out this significant rebuild. We’ll be in touch again soon. |