Intended programme for w/c Sunday 27 July (weather dependent, therefore subject to change)
Owens Place A contra flow remains in place during pavement works in the verge next to HomeZone. No traffic delays are expected. Sunday 28 July to Saturday 3 August 2019. Nights & days: ongoing.
SH2 – Bayfair roundabout Mobile lane closures will be in place while redundant line marking is removed on the roundabout. No traffic delays expected. Sunday 28 July 2019. Nights: 7pm to 6am.
SH2 & SH29A Truck and trailer movements through site access points to move construction plant and deliver materials. No traffic delays are expected. Monday 29 July to Friday 2 August 2019. Days: 9am to 4pm.
SH2 – both directions Lane closures will be in place while road surface remedial work is completed at locations throughout site. Monday 29 July 2019.
Nights: 7pm to 6am.
SH2 – both directions Semi statics will be deployed while surveying is carried out site wide. Wednesday 31 July 2019. Nights: 7pm to 6am.
Long-term traffic management
• State Highway 2 between Te Maunga intersection and Concord Avenue - narrowed lanes and a 50km/h temporary speed restriction are in place for the duration of the project.
• Bayfair roundabout – a 30km/h temporary speed restriction is in place for the duration of the project.
• Matapihi Road, adjacent to the golf driving range – narrowed lanes and a 30km/h temporary speed restriction is in place for the duration of the project. The Golf 360 driveway entrance has been moved towards the rail crossing while pavement works are carried out.
• Bayfair Shopping Centre SH2 northern entrance (closest to Concord Ave) – closed while pavement works are carried out.
• Girven Road, near the Bayfair roundabout - narrowed lanes are in place for the duration of the project and the right-turn from the Bayfair Shopping Centre car park onto Girven Road is permanently closed.
• Access onto State Highway 2 / Maunganui Road from Exeter Street is closed for about 18 months. Resident only access.
• SH29A near Baypark – narrowed lanes and a 50km/h temporary speed restriction are in place for the duration of the project.
• SH2 Papamoa-bound slip lane at the Te Maunga intersection is permanently closed.
|