|
No images? Click here CONSULTATION ON EPC REFORM The Government has now released their public consultation into changes to Energy Performance Certificates (EPCs). Please see the key elements detailed below: Changes to Metrics It is suggested that the current metrics do not provide a sufficient level of detail, and the consultation proposes the below metrics for consideration:
The government is proposing that domestic EPCs use four headline metrics; ‘fabric performance’, ‘heating system’, ‘smart readiness’ and ‘energy cost’ as headline metrics, with other metrics provided as secondary information, and that the carbon metric is maintained as the single headline metric on non-domestic EPCs at this time. Transition It is anticipated that any changes to the EPC metrics will be introduced in the second half of 2026. The government expects that new and/or amended metrics will be introduced for domestic buildings with the Home Energy Model (rather than updates to SAP/RdSAP). An EPC methodology for the Home Energy Model is currently under development and will be consulted on in 2025. Any changes to the metrics for non-domestic buildings will be implemented through updates to the National Calculation Methodology for non-domestic buildings.
Reducing the validity periods for EPCs The consultation proposes a change to when an EPC is required for a property. At present, the validity period of an EPC is 10 years, and a valid EPC is required when a property is marketed for sale or let or is newly constructed. The consultation now poses the question as to what the validity period for EPCs should be, presenting 6 different options, ranging from less than 2 years to 10 years. As well as the validity period, the government is also considering increasing the requirements/trigger points for EPCs. One proposal includes the need for private landlords to get a new EPC when their current EPC has expired. Training and Standards The Government is consulting on various options to ensure all assessors producing EPCs are suitably skilled and qualified, to ensure the standard of EPCs produced can be seen as reliable.
Timescales This consultation is scheduled to last for 12 weeks, from 4th December 2024 to 26th February 2025. Once the consultation closes, the government will review all responses and aim to release an initial statement response within the following 12 weeks.
We would note that this consultation is largely separate from the Future Homes and Buildings Standard Consultation, which we eagerly await feedback on. Visit www.focus-consultants.com or contact one of our ASSESS team on 0115 976 5050. |