Intended programme for week commencing Monday, 19 August (weather dependent, therefore subject to change)

Owens Place A contra flow remains in place during pavement works in the verge next to HomeZone. No traffic delays expected Nights & days: Ongoing

SH2 & SH29A Truck and trailer movements through site access points to move construction plant and deliver materials. No traffic delays expected. Days: 9am to 4pm. Ongoing

SH2 / Maunganui Rd northbound Night lane closure required south of the Bayfair roundabout, while stone column installation takes place. Sunday 18 August to Wednesday 21 August. Nights: 7pm to 6am.

SH2 /Maunganui Rd southbound & Girven Road Lane closures will be in place at Bayfair roundabout while temporary asphalt is laid. Thursday 22 August Night: 7pm to 6am.

SH2 / Maunganui Rd northbound Night lane closure required south of the Bayfair roundabout, while stone column installation takes place. Sunday 25 August to Tuesday 27 August. Nights: 7pm to 6am.

Advanced notice of significant works

SH2 / Maunganui Rd (southbound) Lane closure for traffic switch – Girven Rd. Wednesday 28 August. Night: 7pm to 6am.

SH2 / Maunganui Rd (northbound) Lane closure for traffic switch – Matapihi Rd. Thursday 29 August. Night: 7pm to 6am.
 

Long-term traffic management
• State Highway 2 between Te Maunga intersection and Concord Avenue - narrowed lanes and a 50km/h temporary speed restriction are in place for the duration of the project.

• Bayfair roundabout – a 30km/h temporary speed restriction is in place for the duration of the project.

• Matapihi Road, adjacent to the golf driving range – narrowed lanes and a 30km/h temporary speed restriction is in place for the duration of the project. The Golf 360 driveway entrance has been moved towards the rail crossing while pavement works are carried out.

• Bayfair Shopping Centre SH2 northern entrance (closest to Concord Ave) – closed while pavement works are carried out.

• Girven Road, near the Bayfair roundabout - narrowed lanes are in place for the duration of the project and the right-turn from the Bayfair Shopping Centre car park onto Girven Road is permanently closed.

• Access onto State Highway 2 / Maunganui Road from Exeter Street is closed for about 18 months. Resident only access.

• SH29A near Baypark – narrowed lanes and a 50km/h temporary speed restriction are in place for the duration of the project.

• SH2 Papamoa-bound slip lane at the Te Maunga intersection is permanently closed.