State Highway 20B Early Improvements Update
24 July 2020
Kia ora koutou,
State Highway 20B Project Updates keep you up-to-date with project progress and upcoming physical works on State Highway 20B (SH20B).
Activities next week (26 July – 2 August)
Please note that these works are weather dependent and may be delayed.
During the day (from 7am to 6pm)
• Installation of new service ducting
• Ongoing earth and utility works on the Prices Road corner in preparation for piling to begin
• Installation of network drainage and storm water drainage lines and culverts
• Temporary lighting installation between Orrs Road and Waokauri Bridge
• Earthworks between Campana Road and Waokauri Bridge
• Excavation for transition barriers on the north side of Waokauri Bridge
• Piling works at Waokauri Bridge set to commence Wednesday 29 July
• Ongoing works with ground fill at Manukau Memorial Gardens
• Retaining wall works at the eastern end of Manukau Memorial Gardens
• Service investigation and relocation works throughout the site
• Work on the common service trench from Pukaki Bridge heading towards Orrs Rd
• Activating the new Spark tower and removing the old one
• Complete hauling Chorus cables across Waokauri Bridge to prepare for connecting a new network
• Laying top soil in the swale at Manukau Memorial Gardens
At night (from 9pm to 5am)
• Barrier realignment and installation ongoing
• Extensive exploratory works in the verges and beneath the existing road to verify location of existing services
• Saw cutting existing road for new crossings
• Trenching works for ducting and drainage at multiple locations throughout the site
Looking Ahead
A comprehensive programme of night works is in place to enable trenching for utility services and ducting at multiple locations across SH20B. Posted detours will be in place. We apologise for any inconvenience and thank you for your patience.
Please drive safely and allow extra time for your journey.
Safety
SH20B has introduced the following safety measures to protect all road and shared path users including two temporary signalised road crossings for people on foot and on bikes:
-
All traffic must turn left both into and out of properties and side roads
-
Vehicles turning into driveways and side roads on the southern side must watch for bike and foot traffic on the temporary shared cycle and walking path
-
Night time detours will likely be in place from Sunday to Thursday between 9pm and 5am. Please follow the posted detour routes
-
The speed limit for SH20B is 50km/hr from Manukau Memorial Gardens to Tom Pearce Drive.
|