(Photo: Dushyant Mediratta, site engineer) At night we carry out work that would otherwise disrupt the high volume of traffic on SH20B during the day. This can mean very wet working conditions with 57.6mm of rain recorded on last Thursday night alone!

Story
 
Story

State Highway 20B Early Improvements Update

3 July 2020

Kia ora koutou,

State Highway 20B Project Updates keep you up-to-date with project progress and upcoming physical works on State Highway 20B.

Safety

Puhinui Road SH20B has introduced new safety measures to protect all road and shared path users, including two temporary signalised road crossings for bikes and walkers

  • All traffic must now turn left both into and out of properties and side roads 
  • Vehicles turning into driveways and side roads on the southern side must watch for bike and foot traffic on the temporary shared cycle and walking path
  • Night time detours may be in place from Sunday to Thursday between 9pm and 5am. Please follow the posted detour routes
  • The speed limit for SH20B is 50km/hr from Manukau Memorial Gardens to Tom Pearce Drive. Please drive safely and allow extra time for your journey.

Activities next week (29 June - 6 July)

Please note that these works are weather dependent and may be delayed

During the day; 7am to 6pm

  • Installation of new service ducting
  • Ongoing earthworks throughout the site
  • Ongoing utilities work on the Prices Road corner
  • Relocation works for Vector and Spark at the Campana intersection
  • Installation of network drainage and storm water culverts
  • Barrier works ongoing at Waokauri Bridge
  • Ongoing wick rig works at Manukau Memorial Gardens
  • Retaining wall works at the eastern end of Manukau Memorial Gardens
  • Service investigation works throughout the site
     

At night; 9pm to 5am

  • Barrier realignment and installation
  • Line marking and saw cutting
  • Trenching works for ducting and drainage at multiple locations throughout the site

Looking Ahead

A comprehensive programme of night works is in place to enable trenching for utility services and ducting at multiple locations across Puhinui Road.  Posted detours will be in place. We apologise for any inconvenience and thank you for your patience.

Please plan extra time for your journey.

Story
 

 
Story

BUS ROUTE 380

Due to the road works on SH20B, please expect delays and allow extra time for your journey for those using Bus Route 380. Thank you for your understanding.

Story
 

 
Story

Contact us

Please call us at 0800 796 796 or email sh20B@nzta.govt.nz if you have any questions about the SH20B Early Improvements project.

Story
 

 
spacer

Project overview

spacer
 
 
Story

Waka Kotahi NZ Transport Agency and Auckland International Airport Limited are upgrading State Highway 20B for better and more reliable travel options with a new shared path and additional priority lanes between Pukaki Creek Bridge and State Highway 20.

This project will integrate with improved transport facilities within the airport precinct along SH20B and at the upgraded Puhinui Station Interchange.

The project is the first step of the Southwest Gateway programme to provide better public transport, walking and cycling facilities with safer and more efficient freight movements to, from and around Southwest Auckland.

Fulton Hogan undertakes this work on behalf of Waka Kotahi.

Key early improvements on State Highway 20B to be delivered by 2021 include:

  • A safe place for people to walk and ride bikes
  • Safety improvements including central median barrier protection, improved lighting and a reduced speed
  • Improved pavement, drainage and stormwater treatment
  • Two improved intersections at Campana Road and Manukau Memorial Gardens.

Waka Kotahi NZ Transport Agency works to create transport solutions for all New Zealanders – from helping new drivers earn their licences, to leading safety campaigns to investing in public transport, state highways and local roads.

For more information on the project, you can also visit our website at www.nzta.govt.nz/projects/southwest-gateway/20connect/