Project progress
Activities next week (29 November - 6 December)
Please note that these works are weather dependent and may be delayed.
During the day (from 7am to 6pm)
Zone 1 (from Pukaki Creek Bridge to East of Campana Road)
-
Installing rip rap fabric for erosion and sediment control at Pukaki Creek Bridge
-
Pavement is being laid at the viewing platform on the northern side
-
Installation of northern lighting ducts
-
Fuel line works at Campana Road north.
-
Mechanically stabilised earth wall works on the north side of the road beside the Campana Road turn-off
-
Vector is connecting the streetlights along the shared use path between Campana Road and Orrs Road
-
Completing joints and grout barriers at Campana Road south
Waokauri Creek Bridge
-
Installation of last FRP panels
-
Drilling the central headstock base plates and minor snag works under the bridge
-
Works to start on the transition barrier footings, steel fixing and concrete pouring
Zone 2 (from East of Campana Road to the SH20 interchange)
-
The main entrance to Manukau Memorial Gardens is now closed for upgrading and asphalting
-
Kerbs, channels and barriers are all being installed in front of Manukau Memorial Gardens
-
Final asphalt laid on the widened Manuakau Memorial Gardens area
-
360 device installed for stormwater at Prices Road.
-
Sealing continuing at Prices Road northside along with preparation for putting terminal ends of the concrete barriers.
Utilities (throughout the site)
-
Fuel line protection work has started at the Campana Road intersection
-
Trenching to install the power ducts and other services continues toward Waokauri Creek Bridge
-
The changeover of power to the new network is on schedule for mid December.
At night (all zones from 9pm to 5am, Sunday to Thursday)
-
Ongoing drainage works to verges and road crossings
-
Continuing asphalt pavement replacement along the existing carriageway.
There will be no through traffic from SH20 interchange to the Tom Pearce Drive roundabout. Please follow the posted detour signs on SH20B.
Safety
SH20B has introduced the following safety measures to protect all road and shared path users including two temporary signalised road crossings for people on foot and on bikes:
-
All traffic must turn left both into and out of properties and side roads. Manukau Memorial Gardens is exempt from left-turn movements
-
Vehicles turning into driveways and side roads on the southern side must watch for bikes and foot traffic on the temporary shared cycle and walking path
-
Night time detours will likely be in place from Sunday to Thursday between 9pm and 5am. Please follow the posted detour routes
-
The speed limit for SH20B is 50kph from Manukau Memorial Gardens to Tom Pearce Drive, except at crossing points and coned paving areas where the speed will briefly drop to 30kph. Please drive safely and allow extra time for your journey.
Looking Ahead
An ongoing comprehensive programme of night works is in place to enable trenching for utility services and ducting at multiple locations across SH20B. Posted detours will be in place. We apologise for any inconvenience and thank you for your patience.
Please drive safely and allow extra time for your journey.
|