Intended programme: week commencing 4 May 2020 (weather dependent, therefore subject to change)

SH2 & SH29A Truck and trailer movements through site access points to move construction plant and deliver materials. No traffic delays expected. From Monday 4 May to Friday 8 May, from 9am to 4pm.

SH2 Northbound between Maunganui-Girven Intersection (MGI) and Te Maunga Roundabout Streetlight maintenance and barrier replacement. Monday 4 May, between 8pm to 5am.

Te Maunga Roundabout Removal of old line marking. Tuesday 5 May to Wednesday 6 May, between 8pm to 5am. 

Long-term traffic management

• State Highway 2 Maunganui Rd northbound signalised pedestrian crossing is installed and active for pedestrians to cross the northbound traffic to access the underpass and Bayfair Shopping Centre.

• State Highway 2 between Te Maunga intersection and Concord Avenue - narrowed lanes and a 50km/h temporary speed restriction are in place for the duration of the project.

• Bayfair roundabout – a 30km/h temporary speed restriction is in place for the duration of the project.

• Matapihi Road, adjacent to the golf driving range – narrowed lanes and a 30km/h temporary speed restriction are in place for the duration of the project.

• Girven Road, near the Bayfair roundabout - narrowed lanes are in place for the duration of the project and the right-turn from the Bayfair Shopping Centre car park onto Girven Road is permanently closed.

• SH29A near Baypark – narrowed lanes and a 50km/h temporary speed restriction are in place for the duration of the project.

• SH2 Papamoa-bound slip lane at the Te Maunga intersection is permanently closed.

• SH2 Northbound slip lane turning to SH29A from Te Maunga roundabout is permanently closed.

 

Story
 

 
spacer

More information

spacer
 
 
Story

For more information on the Baypark to Bayfair Link upgrade project, contact us baylink@nzta.govt.nz