Intended programme: week commencing 4 May 2020 (weather dependent, therefore subject to change)
SH2 & SH29A Truck and trailer movements through site access points to move construction plant and deliver materials. No traffic delays expected. From Monday 4 May to Friday 8 May, from 9am to 4pm.
SH2 Northbound between Maunganui-Girven Intersection (MGI) and Te Maunga Roundabout Streetlight maintenance and barrier replacement. Monday 4 May, between 8pm to 5am.
Te Maunga Roundabout Removal of old line marking. Tuesday 5 May to Wednesday 6 May, between 8pm to 5am.
Long-term traffic management
• State Highway 2 Maunganui Rd northbound signalised pedestrian crossing is installed and active for pedestrians to cross the northbound traffic to access the underpass and Bayfair Shopping Centre.
• State Highway 2 between Te Maunga intersection and Concord Avenue - narrowed lanes and a 50km/h temporary speed restriction are in place for the duration of the project.
• Bayfair roundabout – a 30km/h temporary speed restriction is in place for the duration of the project.
• Matapihi Road, adjacent to the golf driving range – narrowed lanes and a 30km/h temporary speed restriction are in place for the duration of the project.
• Girven Road, near the Bayfair roundabout - narrowed lanes are in place for the duration of the project and the right-turn from the Bayfair Shopping Centre car park onto Girven Road is permanently closed.
• SH29A near Baypark – narrowed lanes and a 50km/h temporary speed restriction are in place for the duration of the project.
• SH2 Papamoa-bound slip lane at the Te Maunga intersection is permanently closed.
• SH2 Northbound slip lane turning to SH29A from Te Maunga roundabout is permanently closed.
|