As you would have seen in the July project update, the state highway was hit hard by severe weather causing slips, dropouts and flooding in numerous locations.
These disruptions have impacted our schedule, but we are delighted to say the last remaining work site between SH2/Wainui Road intersection, Matekerepu, and Ōhiwa Beach Road, at Lysaghts bridge, is mostly complete.
We expect to start work on the remaining sections (1B and 1C – refer to map above) early 2023. Work will be similar to what has already been completed, with shoulder widening and roadside barriers installed at high-risk locations. This also includes new roadside barrier through the Pohutukawa tunnels, as shown by our artists impression below.
|
|