View online | Unsubscribe
 
banner

 
Story

Week commencing 12 May 2019

Intended programme for next week (weather dependent, therefore subject to change)

Owens Place A contra flow remains in place during pavement works in the verge next to HomeZone.No traffic delays are expected. Sunday 12 May to Saturday 18 May 2019. Nights & days: ongoing 

SH2 & SH29A Truck and trailer movements through site access points to move construction plant and deliver materials. No traffic delays are expected. Monday 13 May to Friday 17 May 2019. Days: 9am to 4pm.

SH2 – northbound (TEL) Semi static closures will be initiated for box cut construction & street light removal.Minor traffic delays are expected. Monday 13 May to Thursday 16 May 2019. Nights: 7pm to 6am.

Site wide Semi statics will be deployed during site wide road sweeping and safe hit replacement. No traffic delays are expected. Wednesday 15 May and Thursday 16 May 2019. Nights: 7pm to 6am

SH2 – both directions Rolling block closures will be in place while a drilling rig is moved from Exeter Street to the northbound side of the Te Maunga intersection. Moderate traffic delays are expected. Thursday 16 May 2019.Nights: 8pm to 10pm.
 

Advanced notice of significant works

SH2 – both directions A contra flow will be in place during drainage works north of the Bayfair roundabout, between Concord Avenue and Jackson Street. Minor traffic delays are expected. Sunday 19 May to Thursday 23 May 2019.Nights: 7pm to 6am.

Long-term traffic management

  • State Highway 2 between Te Maunga roundabout and Concord Avenue - narrowed lanes and a 50km/h temporary speed restriction are in place for the duration of the project.
  • Bayfair roundabout – a 30km/h temporary speed restriction is in place for the duration of the project.
  • Matapihi Road, adjacent to the golf driving range – narrowed lanes and a 30km/h temporary speed restriction is in place for the duration of the project.
  • Bayfair Shopping Centre SH2 northern entrance (closest to Concord Ave) – closed while pavement works are carried out.
  • Girven Road, near the Bayfair roundabout - narrowed lanes are in place for the duration of the project and the right-turn from the Bayfair Shopping Centre car park onto Girven Road is permanently closed.
  • Access onto State Highway 2 / Maunganui Road from Exeter Street is closed for about 18 months. Resident only access.
  • SH29A near Baypark – narrowed lanes and a 50km/h temporary speed restriction are in place for the duration of the project.
Story
 

 
spacer

More information

spacer
 
 
Story

For more information on the Baypark to Bayfair Link upgrade project, contact us baylink@nzta.govt.nz

Visit our website www.nzta.govt.nz/baylink

Story