NZ Transport Agency Waka Kotahi

SH2 Hutt Valley and Remutaka

Moonshine Hill Road intersection at Riverstone Terraces

1 August 2025


 

High-risk Moonshine intersection to get upgrade

We've completed design for the upgrade to the State Highway 2 (SH2) Moonshine Hill Road intersection at Riverstone Terraces. Construction is expected to start from October 2025 and to be completed by the end of the year.

This is part of the wider programme of work that we're conducting along the 25km stretch of SH2 between Ngāūranga and Upper Hutt. This project has been in development for several years and will provide better safety outcomes for those travelling to and from Riverstone Terraces and State Highway 2. 

This is a high-risk intersection, especially for side-impact collisions due to its current layout and high-speed, high-volume traffic on SH2.

The intersection upgrade will include the installation of traffic lights which will require northbound through traffic and right turning traffic in and out of Moonshine Hill Road at Riverstone Terraces to stop. Southbound SH2 traffic won’t need to stop at the lights. This upgrade will reduce the risk of death and serious injury and will make turning safer and more predictable.

Find out more here

 

 

Speed consultation open

Along with announcing funding and construction for the intersection upgrades. We'll also be consulting on a proposed lower speed limit of 80km/h on SH2 between Moonshine Hill Road to north of Whakatiki Street. This proposed speed limit change is designed to complement the intersection upgrade. The design has changed from the previous consultation and aligns with feedback received. This includes the removal of a raised safety platform, and the speed reduction is proposed as 80km/h rather than 60km/h.  

The intersection upgrade is not open to consultation, as it was already consulted on in 2021 and is now moving into construction. 

Have your say here

 

 

More information

 
 

For more information on the SH2 Moonshine Hill Road at Riverstone Terraces project, contact us at SH2HuttValley@nzta.govt.nz

Visit our website www.nzta.govt.nz/sh2-hutt-valley-and-remutaka